Which states are building the most AI data center capacity? Texas leads

Texas leads U.S. AI data center capacity at 57.0 GW, ahead of Utah and Wyoming. Projects and capacity for all 41 states.

By SpeziaPublished Updated Data as of 5 min read

The short answer

Texas leads on both measures: 41 projects and 57.0 GW of planned capacity, 20% of the U.S. pipeline. Utah and Wyoming follow on capacity with far fewer projects. The top five states hold 54% of the 285 GW tracked by Spezia as of November 9, 2026, and 33 of 41 states have at least 1 GW planned.

  • Texas has 41 projects and 57.0 GW planned, the most of any state on both counts.
  • Texas, Utah and Wyoming together hold 41% of the capacity. The top five hold 54%.
  • 7 states have 10 GW or more planned, and 33 of 41 have at least 1 GW.
  • Project count and capacity rank states differently: Virginia has 14 projects but ranks 19th on capacity, while Ohio has 7 projects and ranks 4th.
  • Capacity is planned at full build-out and says nothing by itself about what is being built. Stage matters more than size.

Which state has the most planned data center capacity?

Texas. Spezia tracks 41 projects there that are not yet operating and report a size. Together they plan 57.0 GW, which is 20% of the 285 GW pipeline across 294 projects in 41 states.

planned in Texas, the most of any state
57.0 GW
of national capacity in the top three states
41%
in the top five
54%
states with at least 1 GW planned
33 of 41
Planned capacity, ten largest states
  • Texas57.0 GW

    41 projects

  • Utah31.6 GW

    12 projects

  • Wyoming27.6 GW

    15 projects

  • Ohio21.0 GW

    7 projects

  • West Virginia16.3 GW

    8 projects

  • Pennsylvania12.3 GW

    8 projects

  • New Mexico11.0 GW

    7 projects

  • Louisiana9.3 GW

    8 projects

  • Montana8.7 GW

    5 projects

  • Georgia8.6 GW

    8 projects

Planned full build-out of projects not yet operating, in gigawatts. Source: Spezia tracker, data read November 9, 2026.

The pipeline is concentrated. Texas, Utah and Wyoming hold 41% of it. Adding Ohio and West Virginia brings the share to 54%. 7 states plan 10 GW or more. At the other end, 8 of the 41 states plan under 1 GW.

For the national picture these numbers add up to, see the U.S. AI data center pipeline.

Which states have the most projects?

Counting projects instead of gigawatts changes the order. Texas still leads with 41, but Wyoming and Virginia come next, and Virginia is third with 14 projects.

StateProjectsPlanned capacityShare of capacityAverage project
Texas4157.0 GW20.0%1,391 MW
Wyoming1527.6 GW9.7%1,838 MW
Virginia143.6 GW1.2%254 MW
Utah1231.6 GW11.1%2,629 MW
Kentucky118.4 GW2.9%761 MW
Alabama104.5 GW1.6%447 MW
Arkansas95.7 GW2.0%629 MW
Mississippi95.4 GW1.9%595 MW
Nevada94.5 GW1.6%497 MW
West Virginia816.3 GW5.7%2,032 MW

Download this table as CSV

Ties on project count are listed by capacity. Capacity and count answer different questions. Count tells you how many separate jobs there are, which matters to a supplier or a contractor looking for work. Capacity tells you how big the jobs are, which matters to a utility planning for load.

Why do a few states rank so high on capacity?

Because their projects are very large. Utah has 12 projects and 31.6 GW, an average of 2,629 MW each. Ohio has 7 projects and 21.0 GW, an average of 2,994 MW. Wyoming has 15 projects and 27.6 GW, an average of 1,838 MW.

Compare Virginia, which has 14 projects but only 3.6 GW in total, an average of 254 MW. It ranks 19th on capacity. Its projects are small on average.

Among states with at least five projects, the largest average project is in Ohio (2,994 MW), followed by Utah (2,629 MW) and West Virginia (2,032 MW). A state with a few giant projects is exposed to their fortunes. If one is delayed or cancelled, the state's total moves a lot.

What is happening in the leading states?

One recent event from each of four states, taken from the news Spezia read in the past month. They are examples, not trends.

StateWhat was reportedSource
TexasThe Taylor city council voted 5 to 0 on October 8 to approve an agreement for a campus near Austin that could reach 1 GW, planned with behind-the-meter gas powerBaxtel
WyomingGoogle said it could invest $17 billion in its first Wyoming data center, near CheyenneWyoFile, via States Newsroom, The Next Web
UtahA proposed hyperscale campus in Hansel Valley is the subject of residents' lawsuits and referendums, with its water and power needs under scrutinyDeseret Magazine
OhioA township zoning commission voted unanimously for a proposed amendment that would bar data centers as a principal land use, in a fight over a reported $5 billion Amazon campusCincinnati Enquirer

Download this table as CSV

Four states, four different kinds of news: an approval, an announcement, local resistance and a zoning amendment. For more on the last two kinds, see data center opposition and delays.

How should you use state numbers?

Three cautions keep them honest.

  1. Capacity is not construction. These are planned full build-outs. Look at the stage of the projects behind a state's number before treating it as a pipeline of work or load.
  2. State lines are not grid lines. Power markets and grid operators cross state borders, so a project's real constraint may be a neighbor's transmission.
  3. Counts move with the research. A state with a handful of projects can change rank with one addition. The date at the top of this post matters.

See every tracked project on the map by stage and size, and open a project file from the pin.

Open the data center map

Every state in the tracker

All 41 states with at least one tracked project, ranked by planned capacity.

StateProjectsPlanned capacityShare of capacityAverage project
Texas4157,047 MW20.0%1,391 MW
Utah1231,553 MW11.1%2,629 MW
Wyoming1527,568 MW9.7%1,838 MW
Ohio720,959 MW7.4%2,994 MW
West Virginia816,256 MW5.7%2,032 MW
Pennsylvania812,250 MW4.3%1,531 MW
New Mexico711,000 MW3.9%1,571 MW
Louisiana89,313 MW3.3%1,164 MW
Montana58,685 MW3.0%1,737 MW
Georgia88,590 MW3.0%1,074 MW
Kentucky118,376 MW2.9%761 MW
Arizona57,038 MW2.5%1,408 MW
Indiana66,348 MW2.2%1,058 MW
Arkansas95,658 MW2.0%629 MW
Mississippi95,359 MW1.9%595 MW
Illinois85,162 MW1.8%645 MW
Alabama104,470 MW1.6%447 MW
Nevada94,470 MW1.6%497 MW
Virginia143,553 MW1.2%254 MW
Tennessee73,549 MW1.2%507 MW
Missouri73,233 MW1.1%462 MW
Michigan33,000 MW1.1%1,000 MW
Oklahoma52,492 MW0.9%498 MW
Oregon71,822 MW0.6%260 MW
Minnesota51,791 MW0.6%358 MW
Wisconsin51,742 MW0.6%348 MW
Iowa31,600 MW0.6%533 MW
Florida21,600 MW0.6%800 MW
North Carolina41,490 MW0.5%373 MW
South Carolina31,469 MW0.5%490 MW
Colorado71,349 MW0.5%193 MW
New Jersey51,325 MW0.5%265 MW
North Dakota51,210 MW0.4%242 MW
South Dakota4995 MW0.3%249 MW
New York4614 MW0.2%154 MW
Maryland4573 MW0.2%143 MW
Idaho2410 MW0.1%205 MW
Kansas1400 MW0.1%400 MW
Washington5396 MW0.1%79 MW
California5204 MWunder 0.1%41 MW
Nebraska180 MWunder 0.1%80 MW

Download this table as CSV

How this was made

Spezia's project tracker reads public filings, permits and reporting, and keeps every fact with the sentence it was read from. This analysis covers U.S. data center projects that are not yet operating and report a capacity, with records of the same project merged (same state, capacity within 5%, no conflicting city). Capacity is the planned full build-out. A project's main constraint is Spezia's model reading its sources, and it is shown only for groups of 25 projects or more. A project is counted in the state where it is filed. The examples of recent events are single stories from the past month, chosen to illustrate a state, and are not trends.

The data was read on November 9, 2026. Figures change as new research lands, and this post is updated when they do.

Sources

  1. Spezia U.S. data center project tracker, research run of November 9, 2026, Spezia
  2. Taylor approves 1GW gas-fired data center campus for Big Watt Powerhouse, Baxtel
  3. Google commits to spending $17B on AI data centers in Wyoming, WyoFile, via States Newsroom
  4. Google's first Wyoming data centre will run on gas with carbon capture, The Next Web
  5. The loudest data center fight in America, as seen from next door, Deseret Magazine
  6. How an Ohio truck driver is fighting a $5B Amazon data center, Cincinnati Enquirer

Common questions

Which state has the most data center capacity planned?

Texas. As of November 9, 2026, Spezia tracks 41 projects there that are not yet operating, planning 57.0 GW, 20% of the national total. Utah is second at 31.6 GW and Wyoming third at 27.6 GW.

How many data center projects are planned in Texas?

41 that are not yet operating and report a size, planning 57.0 GW in total. That is an average of 1,391 MW per project. It counts projects, not buildings, and many are campuses with several halls.

Why do Utah and Wyoming rank so high with so few projects?

Their projects are large. Utah averages 2,629 MW per project and Wyoming averages 1,838 MW, against 400 MW for the typical project nationally. A few very large plans carry their totals.

Does planned capacity mean the data centers are being built?

No. Capacity is the size developers plan at full build-out, whatever the stage. A project may be under construction, approved, or only announced. The national pipeline is only 31% under construction by capacity, so check the stage before reading a state's number as work underway.

Which states have the most data center projects?

Texas has the most with 41, then Wyoming with 15 and Virginia with 14. Ranking by project count differs from ranking by capacity because project sizes vary widely.

Cite this

Spezia. "Which states are building the most AI data center capacity? Texas leads" Spezia, November 10, 2026. https://spezia.ai/blog/data-center-capacity-by-state

You may quote and share this analysis with a link to the post. Plain-text version · RSS

Keep reading

Work with this data yourself

The numbers in this post come from tools you can open on a free account. Ask your own question, filter to your states, and open the sources.

  • Every tracked project on the map, by stage and size.

    See it live
  • 1,000+ U.S. data center projects with status, size and who is involved.

    See it live
  • Ask Spezia

    Start hereFree

    An analyst that answers from verified data, with a source on every figure.

    See it live

See every tracked U.S. AI data center project on one map.

Free to start. No card. Create an account with your name, email and a password and you land in the tool.